Turbomeca USA
Engine Components Manufacturing
Monroe, NC

  • 104,000 SF helicopter turbine production facility:  
    • 84,000 SF production area  
    • 20,000 SF office area
  • Tilt-up construction with a single-ply roof
  • Four production lines were installed with the following services: overhead cranes, compressed air, process water, fiber network and dust collection system
  • DuctSox used in order to meet stringent criteria for temperature gradients and air velocity
  • This is the first new construction project for Turbomeca in the US